Community Updates – Fortune Tower2018-03-03T16:14:29+04:00

JLT Sewerage Network Shutdown on Thursday 9th June 2016

Dear Owners and Tenants,

Please be advised that DMCC will be undertaking a shutdown of the JLT Sewerage Network on Thursday 9th June 2016 to facilitate connection works to the Holding tank which DMCC has recently constructed. The Shutdown shall be managed by Concordia, who will close the required valves across the networks. Itihad Community Management would take necessary measures to ensure no inconvenience is faced by tower occupants during shutdown period, and the tower functions normally via backup arrangement. 

The Shutdown is scheduled to commence at 10:00 pm on the 9th June 2016 until 10am on the 10th June 2016. The shutdown should only affect clusters A to N. Clusters O to Z including Enterprise Zone 1 should be able to operate as normal. DMCC however still request that Clusters O to Z including Enterprise Zone 1 empty their respective holding tanks to minimise flows during the shutdown and provide storage in the event that the shutdown is expanded to those clusters.

All towers and establishments have been asked to ensure that they make arrangements to manage their flows prior to, during and post the shutdown. Those arrangements must be in place until Concordia reopen the network and communicate the same to the community which may exceed the planned 12 hour shutdown.  Accordingly,  DMCC or the Itihad Community Management take no liability for any issues/costs arising from the shutdown.

Regards

Waqar Hasan, CMCA, AMS 
By |June 2nd, 2016|Fortune Executive Tower, Fortune Tower|0 Comments

Access Control System Upgrade

AC1000

Access control system at Fortune Tower is being upgraded. No new locations have been added however,  the two existing locations; B1 DMCC Parking Door, and Ground Floor Rear Door have been fitted with new devices. The reason for upgrade is that one of the devices installed in 2012 had broke down.

The new system will have the ability to issue time limited cards that will automatically expire based on criteria such as tenancy or ID.

New access cards will be personalized with the photo of the card holder adding to the overall security of the building.

During the period we issue new cards, old cards will work. However old cards will seize t0 work after 20th of July 2016.  We urge you to apply for your new access card at the earliest to avoid delays.

Also note that the cards issuance process will be papers less. Click the link below to Apply for your Access Card

Access Card Application

 

Installation in progress.

B1 DMCC Door GF Back Door

By |May 19th, 2016|Fortune Tower|0 Comments

Dubai Population Statistics 2016

Dubai_Statistics_Center_20150118045530Please be advised that the Dubai Statistics Centre (DSC), Government of Dubai, has commenced their above survey since 28 February 2016 and will be visiting you soon, if not already done so. Please see the notification (link below) from DSC detailing their requirements and procedure in this regard.

The Dubai Population Statistics 2016 is a Government of Dubai initiative and hence we kindly seek your fullest cooperation in providing the required information to the nominated DSC Surveyors during their visit.

We reiterate the fact stated in the attached DSC notification that you should not disclose your data to any surveyor who does not hold a valid ID from the Dubai Statistics Centre (DSC).

DUBAI POPULATION STATISTICS 2016

By |May 11th, 2016|Community Updates|0 Comments
Go to Top